We're into the second week of renovation and things are looking good.  The framing for the washrooms are up, plumbing and electrical are in for that area.  The place will have 4 washrooms, two rooms with two toilets and two separate washrooms for employees since I think we will have more than 5 staff members on the floor. The place itself is over 3,500 sq on the main floor alone (2 major rooms and a backroom). Castle will have a maximum capacity of 100 people and it's no small project.

Before

After Framing 


      It's only going to get crazier.  Sometime next week-  two AC units need to be installed , a water tank, and two furnaces need to go in.  There's going to be so much duct work to be done and there is a little confusion on where it's suppose to go according to the architects plan.  I sometimes have doubt if it was worth it to have the ceiling exposed but  I feel like the extra ceiling space would make the place nicer despite all the madness on the ceiling.  Some covers for the pipes, paint and 28 new drop down track lights will make the place brighter (compared to the old boxed lights that use to be there).

This is what the back room looks like. 




No comments:

Post a Comment